Sand Box Fabrication Instruction
Difficulty
Medium
Duration
285 minute(s)
Area
Production
Business
Manufacturer

Use protective eyewear
Use hearing protection
Use protective footwear
Use protective handwear
Use protective clothing
Rinse hands

Step 1 - Deburr

Make sure all parts are deburred to requirements

0.2mm to 0.5mm Radius




Step 2 - Folding

Fold Parts as per the part drawings in Lantek




Step 3 - Assembly

Tack weld parts

  • Make sure fitment and squareness is good
  • Fully weld as 3mm Fillet
  • Make sure both large side faces are flat across cutouts to within 2mm with steel rule




Step 5 - Rivet nuts

Fit Rivet Nuts

  • 4 off Item 9 -M12
  • 12 0ff Item 10-M6
  • 4 off Item 11-M8





Step 6 - Quality Inspection

  1. Inspect all welds
  2. Measure all Balloons in inspection FAI
  3. Pack and wrap ready for delivery

Comments

Draft